Mark Group's Head Office is in Sydney; with branches in Newcastle, Wollongong, the Central Coast and Melbourne. The company has been involved in home energy efficiency and solar power since 1974.
The Mark group says that it performs over 6,000 energy efficiency related installations globally each week, and as more and more customers tell their friends about how happy they are with their solutions, this number is growing rapidly.
A supplied customer referral said: “It was installed about a week after I paid the deposit. The installers were quick and efficient, and very polite. They were more than willing to explain everything to me.” Another customer said: “I have to say the installation guys were the most professional respectful people I have ever dealt with”.
Mark Group Australia say that all of their products are installed by skilled and trained company employees. The company conducts rigorous quality assurance on both installation and products; and provide industry leading guarantees on products and labour.
Here are their reviews as rated by SolarQuotes users:
Panel brands previously installed
Inverter brands previously installed
The views expressed by reviewers are theirs alone, and do not necessarily reflect those of Peacock Media Group, which makes no representations as to the accuracy of the reviews. For our full disclaimer and further information, see our Terms of Use and our Review Guidelines.
Mark Group Reviews (1683)
Show Most Recent reviews from All time across Australia
Average Scores
Value for money
Quality of System
Installation
Customer Service
- 5 star 116
- 4 star 1141
- 3 star 341
- 2 star 56
- 1 star 29
View Timeline
30 April 2024
30 April 2024
11 January 2022
Original Review on 01-03-2012:
120 months later we asked Naveen: "Are you happy with the performance of your system so far?"
The inverter worked for just under 10 years and has to replace with new inverter.19 April 2021
Mark Group Australia Pty Ltd installed a dead data card in the Fronius inverter.
Mark Group Australia Pty Ltd was very slow to repair their faults.
I have hail damage on eight of the 39 solar panels; Renesola does not respond to my emails regarding a possible warranty claim for hail-damaged panels.
Mark Group Australia Pty Ltd merged with Solgen.
Renesola seems to have closed down in Australia.
Avoid buying Renesola panels due to bad after-sales and warranty service.
Panel rating: 1/5
14 June 2020
29 February 2020
Stay away!
Installed illegally, conduit tucked under tiles instead of sealed through a gasket. Dodgy wiring, wires crimped with pliers instead of proper crimped which were shorting. Brackets not trimmed.5 years of 50% production from a 5kw 9k system, little difference to bills & extremely poor customer service & follow up on repairs. STAY AWAY!!!!!
Inverter rating: 2/5
28 May 2019
Dodgy installation of inverter
Our inverter (Fronius) has just started giving us an error code after 6yrs of service. We are no longer under warranty and so have had to go out and get quotes for a new inverter. Weâve now had two sparkies tell us that the Fronius inverter we have had installed by Mark Group looks to be a knock off version. And that the display does not accurately tell us what the issues is it even how much electricity we are putting back into the grid or even generating?03 April 2019
25 February 2019
13 August 2018
Inverter rating: 1/5
02 May 2018
13 April 2018
On the plus side it has paid for itself (just) over the 5 years we've had it, but only because we get a good feed-in rate. On the down side, performance has declined >3% per year which is a bit more than I expected. Now with some experience in this, if I were thinking of doing it all again with today's options, I'd install double the capacity - more if possible - using east & west facing roof faces, not just north, and look hard at batteries. Would also want a way to isolate from the grid during transmission failures, i.e. don't necessarily want to go off grid, but don't want grid problems to prevent access to solar or battery power while grid is being repaired. With current setup, the solar system is useless if the grid is down.
FYI, panels are Trina Honey (x16) and I'd look hard at higher end panels with more output and longer performance life.
03 March 2018
Panel rating: 4/5
19 January 2018
07 December 2017
Inverter rating: 1/5
07 December 2017
Inverter rating: -1/5
21 November 2017
The day they put panels up the meter was suppose to go in but the guys here said they weren't putting meter in today, my husband said that's why l took the day off so l could have trench ready to lay leads, and cover up so they put meter in, now our bill is higher than it ever was, and the Solgen person looking after my case winged about having 172 other cases she was working on and her CEO has given her some of his cases, and she would get to it as soon as possible, finally a week ago an electrician came, he had never seen the type of meter we have, and Solgen said he has still not put his report in, so we pay while we wait. They don't return calls, there is no after sales service, we have complained since day 1 about outer solar and were told it was us, using more than we were making, but we weren't making anything, if anyone has any suggestions l am open to hear them, we just wanted a cheaper electricity bill and it has gone up and we have to pay for the solar system as well.
29 June 2017
Inverter rating: 4/5
13 June 2017
09 February 2017
Original Review on 10-06-2016:
Installed today - June 10, so all still very new! However everyone associated with Mark Group from Michael in sales to Harry and his installation team - they were all very helpful and very professional! Let's hope it delivers everything as promised!!8 months later we asked Merry: "Are you happy with the performance of your system so far?"
Exceeded my expectations. If this keeps going at the same efficiency, I'll have paid it off much earlier than anticipated!Now I just need an affordable battery!!
21 January 2017
Promised by Solgen to fix within a week, THREE MONTHS later still awaiting the fix.
08 December 2016
Original Review on 05-04-2016:
Thanks to Finn I've been able to get: a small system I could afford on the pension; with a good company whom I trust; and a local sales person who was great and sincere; and an installer who is also local and professional.8 months later we asked John: "Are you happy with the performance of your system so far?"
Yes.22 November 2016
15 November 2016
07 November 2016
Original Review on 07-03-2016:
8 months later we asked This person: "Are you happy with the performance of your system so far?"
I am very happy with my systems performance.10 October 2016
Original Review on 09-02-2016:
Mark Group were the only one who sent a person to see us and our property, the others just emailed quotes.The sales advisor was very knowledgeable and provided us with a great deal of sound information about how to get the best from a solar installation. He recognised the unique nature of our property and came up with several alternatives i.e. different panels & inverters.
As we wished to have minimum panels and maximum efficiency we chose Sunpower 327w panels & Fronius Inverter which seem to be leaders in the field.
8 months later we asked Greg: "Are you happy with the performance of your system so far?"
We think so - our electricity bill has reduced significantly. Unfortunately the after sales service has been a let down. We were supposed to get a year of Solar Analytics monitoring to help us to better utilise the power we generate. Despite numerous phone calls - the last being 3 days ago and an earlier visit by a technician (without notice and when we were out) several weeks ago, we're still waiting to hear something. Not sure if the fact that Mark Group is now Solgen has something to do with the problem but customer service now seems to have gone on a long holiday.02 September 2016
15 August 2016
Original Review on 13-12-2015:
Installation of system including panels and inverter completed on 3rd December 2015.Inverter at installation date found not to function. Required service technician to establish cause of problem.
Had to wait till Saturday 12th Dec for service check. Took some time to establish fault.
Fault apparently due to grid voltage being high at 256 volt rather than required voltage at 240 volts.
Inverter does not function at the higher voltage. Need to upgrade inverter to Queensland standard which operates at higher voltage.
Could not access inverter code to make necessary changes to inverter . Hopefully will obtain code from Fronius on
Monday 14th Dec. If so not sure when technician will be able to make changes to inverter.
Indicated that it will not happen before Christmas and may have to wait till middle of January 2016.
Very disappointed with this service approach as system has been fully paid for.
8 months later we asked This person: "Are you happy with the performance of your system so far?"
Yes - able to monitor power generation and usage on computer03 August 2016
Original Review on 17-03-2016:
After being promptly provided with quotes I contracted Mark Group. I believe work was of good quality but customer service was lacking. A Solar Analytics was included by the salesman. When the main solar panel system was installed in October I kept pursuing the salesman for the Solar Analytics. I finally gave up, called Mark Group to find the salesman no longer worked there, no-one had informed me, and that I needed a new switch board (no-one had told me that either) before the Analytics could be installed. This was just before Christmas and I couldn't find an installer until late January to replace the switchboard. Then I kept chasing Mark Group for the Solar Analytics to go in. This took 6 more weeks of phone calls and promises.Finally, from getting quotes in September, we are finally up and running mid-March. The system appears to be performing well.
5 months later we asked Des: "Are you happy with the performance of your system so far?"
At this stage I have to say the system has performed to expectations.30 July 2016
23 July 2016
Original Review on 19-11-2015:
8 months later we asked Daniel: "Are you happy with the performance of your system so far?"
yes08 July 2016
Original Review on 18-11-2015:
It has been 3 weeks since instillation and the system is not working yet!!! apparently due to and Energex high voltage issue. So I have selected "average" above until the system is operational (hopefully before my next power bill!!!!). When it is operational I will do this survey again and hopefully my remarks will be better.8 months later we asked Chris: "Are you happy with the performance of your system so far?"
Yes it has performed exceptionally well. It was actually a problem with the Energy supplier on the street that caused my solar system to not perform after installation. The grid was not suitable for the energy we were creating and therefore the grid provider shut our inverter down. Some switches and impedance changes have fixed the problem so far.28 June 2016
Also I am a bit confused with a notice from ERGON with fault defects and they haven't put their reader in yet. My electrician seems to think the electrician who installed the system should have to rectify the faults and bring the meter box up to ERGON standards.
20 June 2016
The Mark Group have since supplied the best value for money and cheapest quote alternative. We have actually sized a 15kw battery ready system with 19kW of solar panels, (3 phase). They have not installed yet as we are waiting on Energex approvals.
The system also has 10 year warranties on the equipment and the installation.
18 June 2016
In fact the Mark Group was slightly more expensive with their salesman more experienced and explaining things in more detail.This was probably the only difference The installers were really good - working all day in light rain.
Thank you for your help in this - we only got connected to the grid about ten days ago so will need to be a bit patient for end of September.Thanks again.
David
12 June 2016
07 June 2016
We were particularly happy with our Mark Group rep who enlightened us greatly whereas both other reps simply wanted to sell us the biggest system they could.
06 June 2016
30 May 2016
28 May 2016
25 May 2016
19 May 2016
This took me 3 months of solid dedication to come to an informed decision - I have become some what of a solar expert ??
I would not recommend buying through a cheap solar company - evidence has shown me that U really do get what U pay for with solar systems.
17 May 2016
14 May 2016
Original Review on 16-09-2015:
Ergon Energy Mucked us about with approval for the Install for over 4 weeksNot installers fault, they installed as soon as approval granted.
8 months later we asked Michael: "Are you happy with the performance of your system so far?"
yesachieves 90-95% + rating of system during good sun
13 May 2016
Original Review on 08-09-2015:
8 months later we asked Alex: "Are you happy with the performance of your system so far?"
Yes definitely.08 May 2016
Original Review on 06-09-2015:
Installer very knowledgeableFollow-up conversations with Head Office lack knowledge of their product & information on Meter Readings. No one in their office is able to answer questions about the running of the Solar (how much power needed to run dishwasher etc)
In & working in 3 weeks, we made 15 calls to Electric Co. and Supplier
So far, we are happy. Thanks for your help
8 months later we asked Clare: "Are you happy with the performance of your system so far?"
Yes, so far!! We may have been lucky & have not had any issues, long may that last.21 April 2016
19 April 2016
Installed 16/3/16 no grid connection until 26/5/16 - not happy about that
Head Office / salesman / installer have all failed to respond to email questions posed by me at different times
On occasions when I have rung Head Office, you are not even put in a queue if no one is available.
13 April 2016
19 March 2016