10 Reasons To Get A Solar Or Battery Site Inspection (And One Reason Not To)

10 reasons to get a pre-purchase solar site inspection

Part of buying a rooftop solar power and/or battery system is getting the site inspected by the installer, preferably before signing on the dotted line. This can be done physically on-site, or remotely, thanks to the wonders of modern technology.

Personally, I would opt for the on-site inspection, or a combination of both if possible. Maybe you have an aversion to perceived high-pressure salespeople, are too busy, or the installer simply won’t visit. Either way, here are 10 good reasons to get a pre-purchase on-site inspection for solar, and one reason not to.

#1 Assess The Installer’s Character And Professionalism

They say first impressions count. By meeting the installer in person prior to the job you can get an idea if your job is high up on their list of priorities. How they conduct themselves will most likely mirror their work ethic.

You can also ask questions that are difficult to answer by email. Discussing current energy consumption is a must, but also future plans such as adding a solar battery, EV charger, or if you’re nice to them, identifying ways to reduce your overall consumption without altering your lifestyle.

If a solar installer won’t even come out to your place to get a potential job, then what are the chances of a warranty issue being taken seriously? These companies are most likely working on such tight margins that they can’t afford to see you other than to get in and out as quickly as possible. Is that a good fit for you?

#2 Check The Structural Integrity Of The Roof

It’s obviously important to make sure that your roof can handle the load-bearing capabilities a solar panel array requires. This is something that can’t be done remotely by viewing a property on Google Earth! Solar panels are heavy and lots of them are even heavier. Add a storm into the mix and you could have a problem.

This is also an opportunity to check for broken tiles, damaged ridge capping, and other potential leaks. If your house is on the older side consider having a roof inspection done by a professional builder as well. You’ll save a bucket of money by getting the roof repairs done before, rather than after the solar panels go on.

#3 Measure The Roof Area

Nothing beats actually running a tape measure over the roof to double-check that the solar panels are all going to fit on. It sure would be good to get what was promised on the phone! As my high school woodwork teacher used to say – “Measure twice, cut once. Not the other way around.” Hi-res aerial imagery is great, but if it’s a close call, send someone up with a tape measure before install day.

#4 Get An Accurate Shading Assessment

The installer is obliged by law to give you an accurate assessment of the likely solar production and energy output of the system in its installed location. This figure should be in your final quote before you sign the contract and should include the reduction in performance caused by any shade other than the sun going down.

There are various ways of doing this. Here are some listed in order from best to worst:

  1. On-site, standing on the roof using a shade assessment tool such as a SunEye or Solar Pathfinder (best).
  2. Remotely, using software such as Pylon Observer or Nearmap shading analysis tool (the jury is out).
  3. On-site, eyeballing it from the roof (not good enough).
  4. On-site, eyeballing it from the ground (you’re joking).
  5. Remotely, from Google Earth (just no).

Bear in mind that climbing on roofs is dangerous. During a pre-purchase site inspection, the solar installer/ salesperson may not have adequate safety gear to climb up on your roof, especially if it’s a steep pitch or multi-storey. If it’s deemed unsafe, then initially, a combination of 2. and 4. above would have to suffice, followed up with no 1. on install day.

#5 Determine The Cabling Routing And Distances

It’s always best to have an installer do the site inspection rather than a salesperson who may not have trade experience or technical knowledge. The two main relevant factors here are building construction and cable run length.

Regarding building construction – the installer can determine the ceiling space access, and use of wall cavities for cabling. They can also tell you if there’s likely to be any exposed conduit, which will affect the overall look of the job.

Cable run length is critical to the efficiency, and, ultimately, the solar power system’s energy output. Volt drop/rise is the enemy, so the key is to keep cable run lengths to a minimum as far as practical. Google Earth can’t do any of that!

#6 Scope Out The Best Inverter And Battery Location

These are the 3 golden rules for solar inverter location:

  1. It should be located out of direct sunlight.
  2. It should be located out of direct sunlight.
  3. It should be located out of direct sunlight.

Other factors may dictate the chosen inverter location such as the IP rating of the inverter (water and dust protection) and the above cable run length. This is relevant for AC cables running to the switchboard and DC cables from the solar panels. Inverter noise is sometimes an issue. Also, it’s a good idea to make sure there’s enough room close by for a future battery. Only an installer will have these answers because they know the rules law.

If you are getting a home battery, then there are very stringent rules on where it can go, making a site inspection essential.

#7 Assess Switchboard Condition And Suitability

It’s best to know if your switchboard needs upgrading BEFORE the job goes ahead rather than after for 4 reasons.

  1. If your switchboard needs upgrading it will certainly add to the pricing and this will affect your ROI (return on investment) calculations.
  2. The installer can determine whether you have room for additional circuit breakers and if you’re on a single or 3 phase supply, which may possibly give you more system design options.
  3. If you are getting a battery, you can agree on which circuits will be backed up in a blackout and which ones you can live without.
  4. It would be a pity to have a nice new rooftop solar or battery system installed that can’t be turned on because your switchboard isn’t ready.

Having said all that, a clear photo of the switchboard and meter emailed to the installer before the final quote would suffice nine out of ten times.

#8 Explore Other Design Options

Having all the above information at your fingertips before install day can give you and your solar installer a new perspective and possibly open up some design options that weren’t previously considered. Perhaps you’re lucky enough to be able to fit more panels, or shading is a bigger issue than you thought. Maybe your 3 phase supply gives you more options for a battery or solar upgrade down the track.

Don’t be too precious with preconceived ideas about how you think your rooftop solar system should be. As you gather the information, you learn, and it can result in a better outcome.

#9 Get A Firm Quote

All the above leads to the installer being more likely to be able to give a firm quote for the job. There hopefully won’t be too many exclusion clauses on the paperwork such as:

“Supply and install bah blah system for $xxx *subject to suitability of the site, subject to blah blah blah.”

#10 Minimise Surprises On Install Day

We all want a happy life. You’ll sleep better at night with the questions already answered by having an on-site inspection before the big day. What if the roof is in subpar condition? What if they can’t fit the solar panels up there? What if they can’t do what they promised on the phone?

Do you want a situation to play out on install day when you have an important meeting and have to pick up the kids early from school?

One Reason Not To Have An On-Site Inspection

If you have a fairly modern house with a large unobstructed north-facing roof with no shade, and you have a few options for solar inverter location that you can live with, you don’t mind any last-minute changes, and you have faith that your chosen installer can deliver the goods without eyeballing your place, then I say go for it!

For everyone else…

Play safe. Try to get a site-inspection before you sign up. It doesn’t matter how good your solar installer is – he/she doesn’t own a crystal ball and cannot know the full story before being on site. No two houses are the same and no two households use energy the same way. It might be OK for him/her to change the plan last minute because he’s/she’s done it before and is prepared, but are you?

About Kim Wainwright

A solar installer and electrician in a previous life, Kim has been blogging for SolarQuotes since 2022. He enjoys translating complex aspects of the solar industry into content that the layperson can understand and digest. He spends his time reading about renewable energy and sustainability, while simultaneously juggling teaching and performing guitar music around various parts of Australia. Read Kim's full bio.

Comments

  1. Hi Kim

    Great article. However, personally I think a site inspection is only required on maybe 10% of jobs. These days satellite images and switchboard photos are sufficient 90% of the time.

    Most solar companies have seperate employees for sales and installation, which would make it very difficult to coordinate both prior to the customer signing anything.

    If solar companies are to do a full site inspection for every quote, it would significantly increase the cost of solar for everyone. Which I don’t think is fair on the 90% who have simple roofs.

    While it would be nice to have this luxury, It doesn’t seem to be the industry standard either. Which again, might make anyone doing site inspections for every job very expensive.

    Just my 2 cents..

    • Any company that can’t be bothered to send a person to perform a proper site inspection doesn’t deserve anyone’s business. A site inspection before the day of installation is actually a recommendation in As5033.

    • Kim Wainwright says

      Valid points you make Luke, and sadly I think you’re right with regard to the industry standard.

    • Neil Langford says

      Mmm, an unfortunate response in my opinion. Yes, most companies have separate staff for sales and installation, but the original article made that clear, and it is no surprise. However you suggest that sending experienced technical staff to site for an inspection would put up the price of installation for every customer – not true. Fact is, it should only put up the price of the installation for those who request it !

      I have (so far) approached three installers, all recommended by Solar Quotes, and not one of them has attended site, so I have not proceeded with the project. Believe me, I want to do the job, and very soon if I can. However I refuse to deal with low margin (potentially low quality) installers who will not even look at the site. I want a quality job, and I’m happy to pay for it, well above and beyond the average project cost. However so far I have not found an installer who is interested in anything other than production line / cookie cutter projects. This is very frustrating.

      I want to use top of the line panels, micro-inverters and system components. I want the system design to include a battery and EV charging. It must serve as a battery backup during mains power outages and it must be able to charge from the solar when the mains is down. So it clearly won’t be a cookie cutter cheap project, there must be profit for installer too – but I can’t find one.

      I spent 20 years doing complex electrical and electronic systems installations all over the world. I do understand about contracting, about design costs, about all the things involved in running a profitable technical business. And I want my contractor, whoever that ends up being, to make a fair profit.

      I have reasonable expectations for the efficiency and effectiveness of what can be installed on my home. I lived off-grid on solar and batteries for 20 years. I just need a quality installer who wants to do a quality job. Can you name one in Melbourne?

      • Hi Neil,

        Thanks greatly for letting us know about this and for your chat with me over the phone. Apologies about the delay in your quotes with us – through your original request in 2020 you were unfortunately matched with 2 solar installation companies that we no longer recommend based on similar experiences you have had.

        I have suggested a couple more installers for you via e-mail, please reach out to them when you are able, I believe they will be able to get the ball rolling and suit your installation needs.

        If you need any further help or have questions about solar in the future, feel free to reach out 🙂

  2. Even with the installer coming out to look at our site and switchboard, they still failed to notice that the switchboard would need the cabling back to the SAPN fusebox to be upgraded (old house). Six months and three thousand dollars later … so, you know, you can do everything you’re supposed to do and things can still gang a-gley.

  3. #4 Shading Assessment – Nearmap is a good tool for this – specifically most locations have enough photos to give a very good idea of shade throughout the hours of the day and seasons of the year.

  4. When you say: “Having said all that, a clear photo of the switchboard and meter emailed to the installer before the final quote would suffice nine out of ten times.” I’d like to draw your readers’ attention to the 10th case. I sent in photos to a (very large and highly reputed, or so I thought!) installation company who wrote back that I had nothing to worry about. Wrong! What a skilled observer, not me or as it turns out they, ought to have diagnosed was the absence in the photos of the service mains fuses. These were CERAMIC and attached, out of sight, on the BACK of the board. The guy who came out to install the new meter judged, merely from the street, that the age of place would probably have those ceramic mains fuses and he was not accredited to replace the meter while those ceramic service mains fuses were there. Further delays ensued until a more highly skilled electrician arrived to replace those troublesome ceramic service mains fuses (those are UPstream of the meter). Then the meter guy could return to complete the job. Delays: about 4 months. My mistake: I hadn’t chosen an installer monitored by Solar Quotes. Sorry, Finn, very sorry.

  5. Lyn McDonald says

    Here here!
    As an Engineer, I say a site visit IS necessary in Most cases for the benefit o lack of problems later.
    Solar is a “dangerous game for the purchaser”at present as so many sharks are trying to make a buck.
    I requested a contractor who was offering Battery Installation to site visit. They didn’t even have a tradesman on their staff and they didn’t know what they were talking about electrically .
    After they visit by their subcontractor, they still couldn’t tell me what they proposed to install and how it would operate. And this was a recommended Contractor.

  6. Kim Wainwright says

    Thanks Daniel. I’ve updated the post to reflect this.

Speak Your Mind

Please keep the SolarQuotes blog constructive and useful with these 5 rules:

1. Real names are preferred - you should be happy to put your name to your comments.
2. Put down your weapons.
3. Assume positive intention.
4. If you are in the solar industry - try to get to the truth, not the sale.
5. Please stay on topic.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Get the latest solar, battery and EV charger news straight to your inbox every Tuesday