I just received a long email in response to my blog post about what to watch out for with ultra cheap solar power systems.
After reading the email (published below) – It sounds to me (without knowing any other details) that the fundamental problem here may have been that the system was not properly designed by a CEC Accredited Solar Designer. (note: A CEC Accredited Solar Installer is not necessarily qualified as a Designer – so always double check). If a CEC accredited designer had done the most basic calculations on this system initially – then the oversizing problem would have been avoided.
The moral of the story: Always ask to see the design document for the system you are about to invest thousands of dollars in. And make sure that that document is signed off by a real person who is CEC Accredited as a Solar Power System Designer.
Here’s the sorry tale as told by Phill in his email: [Read more…]
Currently Raging Debates: